CLARIFICATION TOWER

Clarification of ecessive water

Washing and grinding water can be cleaned in a clarification unit that uses the Dortmund design principle. Water is fed into the inner pipe and due to restraint guidance and the effect of gravity the fines areaccelerated downwards and
clear water upwards, in an outer pipe.

A thinker in the lower part of the tower keeps the fines from going hard. The
sludge can be pumped away and offers the possibility of being returned to
the batching process or further processed through a filter press.

 
Clarification of coloured water

Das geklärte Wasser kann in den Produktionskreislauf

  • zur Betonherstellung
  • zur Oberflächenbehandlung (Betonsteine, Pflastersteine, Platten, Fassaden,...)
  • zur Reinigung von Mischer, Kübelbahn,...

wieder eingebracht werden.

Reduzierung der Wasserkosten durch:

  • Wiederverwendung des geklärten Wassers
  • Vermeidung von Abwassergebühren
  • geklärtes Wasser wird im Kreislauf gehalten

Reduzierung der Abfallmengen durch Auswaschen der Zuschlagstoffe

Erhebliche Reduzierung der Entsorgungskosten:

  • Ausgewaschene Körnungen werden dem Produktionskreislauf zugeführt
  • Einhaltung der gesetzlichen Bestimmungen

12.04.2013: READYMIX ABU DHABI

Two factories belonging to Readymix Abu Dhabi equipped with BIBKO recycling systems

18.07.2012: MEBIN - NETHERLANDS

New residual concrete recycling system for Mebin

BIBKO® Umwelttechnik & Beratung GmbH
Steinbeisstr. 1 + 2, 71717 Beilstein, Germany
Phone: +49 7062 9264-0, Fax: +49 7062 9264-40
E-Mail: info@bibko.com

EXHIBITIONS: VISIT US.
BIG 5 - Dubai (UAE) 25 - 28 Nov 2013
ICCX 2013 - St. Petersburg (RU) 3 - 6 Dec 2013